Confidential consultation

Forensic intervention phase

We prepare and review the delay, disruption, and damages quantum that underpins expert testimony in high-stakes energy and infrastructure arbitrations ‘so the numbers hold up under cross-examination before they ever reach the tribunal’.

Delay model · Active
€2.4Bn
Total project
value
98%
Favorable
resolution
27+
Senior expert
years
3x
Active
jurisdictions
Document analysis Scanning
Critical path Modeling
Damages quantum Computing
Scroll
International jurisdictions and reference frameworks
London
Geneva
ICC / LCIA
FIDIC Frameworks
NEC Contracts
Onshore
Offshore
THE EXPERT BEHIND THE EXPERT

Direct access.
No intermediaries,
no junior modeling.

Most large firms build the quantum with junior consultants and only bring in a senior name once the model is already built. That approach leaves the numbers exposed exactly when hundreds of millions are at stake.

That's why Erne Renewables operates exclusively as an Elite Institutional Boutique. Every model, every calculation, and every assumption is built and reviewed personally by a quantum expert with over 15 years of frontline experience — before it ever reaches your testifying expert. The result is analysis designed to withstand the most rigorous scrutiny in demanding jurisdictions like London, Geneva, United States, UAE and Brazil.

+€645M
Quantum upheld
(2024)
Strategic Consulting
Strategic Consulting · Board Level
Legal and documentary audit
Legal and documentary audit
TWO PATHS · ONE QUANTUM

Rigorous quantum,
delivered in the language
each stakeholder needs.

The same mathematical rigor, translated for two audiences: technical precision for the engineers and project teams who lived the delay, and evidentiary solidity for the counsel and tribunal who must be convinced by it.

Project management on site
01 / For on-site operations

Project management

Is the schedule in the red, the site suffering delays, and are you facing multi-million dollar contractor claims? We intervene on your site in real time to regain control and stop the bleeding before the damage becomes irreversible.

  • Live delay and disruption mitigation (Onshore & Offshore)
  • Commercial and contract management (FIDIC/NEC)
  • Claim identification, preparation, and defense
Legal direction and consulting
02 / For arbitrations & litigation

Legal direction

Has the project failed and are you preparing for an imminent international litigation? We armor you with mathematical evidence and irrefutable expert reports so you don't just go to defend yourself, but to dominate the arbitration.

  • Senior expert testimony (Expert Witness)
  • Forensic audits of financial damages (Quantum)
  • Forensic delay analysis (Delay Analysis)
THE QUANTUM PROCESS · THREE PHASES

Quantum analysis built to survive cross-examination.

Every megaproject generates a chaotic mass of records, logs, and correlated data. We convert that into a rigorously modeled delay and damages quantum — reviewed and stress-tested before it ever reaches your expert witness, so their testimony stands on evidence that holds under the most rigorous scrutiny.

01
Reconstruction phase

Data extraction and reconstruction

We meticulously analyze every record, daily log, and complex contract to reconstruct the true timeline of events — leaving no blind spots for opposing counsel to exploit.

FIDIC NEC Daily Logs Due Diligence
02
Modeling phase

Damage and delay modeling (Quantum)

Using bespoke critical path methodologies, we isolate the root causes of delay and calculate the exact financial impact with mathematical certainty.

Critical Path Delay Analysis Quantum SCL Protocol
03
Review phase

Expert witness preparation and review

We prepare the quantum analysis and stress-test it against cross-examination before it reaches your expert witness — reviewing every assumption, calculation, and exhibit so their testimony rests on a foundation the tribunal cannot shake.

Expert Report Witness Preparation ICC LCIA
CRITICAL PATH ANALYSIS

We visualize the delay before reaching the tribunal.

Our forensic modeling tools reproduce the project's actual timeline, identifying every disruption with day-level precision and quantifying its exact financial impact in euros.

Critical Path Monitor · Project NL-07 Disruption detected
Foundation
Monopile Inst.
Cable Laying
Turbine Inst.
Commissioning
Baseline
PROTECT YOUR TECHNICAL POSITION

Armor your project.
Secure your technical
position.

Whether mitigating severe disruptions in an offshore megaproject or preparing the defense for a make-or-break international arbitration, true senior authority makes the difference between an unfavorable settlement and a technical victory. Back your project with maximum precision today.

Total confidentiality
London · Geneva · Amsterdam
Direct access to the senior expert